Home Zimbabwe News ZESA announces 8-hour daily National load-shedding

ZESA announces 8-hour daily National load-shedding

Load-Shedding

ZESA announces 8-hour daily National load-shedding. The country’s struggling power utility, Zimbabwe Electricity Supply Authority (ZESA) has announced an 8-hour national load-shedding.

ZESA through its distribution arm, Zimbabwe Electricity Transmission and Distribution Company (ZETDC) has cited depressed power generation as the reason behind the move.

However, ZESA did not announce how long will this load-shedding run. Below is part of the schedule.

ZESA load-shedding scedule

Zwnews

In other news – Mugabe family holds a memorial service for the late former president: Pics

Mugabe family holds a memorial service for the late former president: Pics. With all the chaos that is surrounding the death and burial of the Late Former President Robert Mugabe, the family decided to hold a memorial service and shutter out all the noise going on. Check the pictures below and the drama circulating his re-burial proposal by the court.

Robert Jnr and Grace Mugabe

Careful planning and engineering to drill 1.83m into the concrete-filled, iron and steel protected grave of the late…Learn More.

Previous articlePolice confiscates 353 smuggled bales of clothes from Magaba flats in Mbare
Next articleHorror as sisters team up with friend to kill boyfriend