Zimbabwe News

Harare shutsdown Morton Jaffray and Warren Control waterworks

Harare shutsdown Morton Jaffray and Warren Control waterworks. The City Council has decided to take this action in order to maintain some of the parts that are being currently used at the waterworks.

Harare City Council has announced that it will be shutting down its two major waterworks, Morton Jaffray and Warren Control Pump station from the 3rd to the 5th of December to allow repairs to be made.

Here is the local government’s statement:

PUBLIC NOTICE: SHUTDOWN OF MORTON JAFFRAY AND WARREN CONTROL WATERWORKS.

Please be advised that there shall be a shutdown of Morton Jaffray and Warren Control Waterworks on Friday 3 to Sunday 5 December 2021 to allow for works to be carried out at Warren Control Pump Station and on the new line that will supply Hopley.

The works are expected to improve the mechanical performance of the newly installed pumps at Warren Control and also allow Hopley to start accessing water.

The shutdown will enable the department to undertake repair works at 3 points on trunk mains to reduce physical water losses currently obtaining in the system.

Residents are encouraged to use water sparingly during this period.

Acting Town Clerk

Eng. P. Moyo

Source – Pindula News

In other news – Zimdancehall chanters Platinum Prince and Boss Pumacol clash on social media

Zimdancehall chanters Platinum Prince and Boss Pumacol clash on social media. There is a war currently going on right now between chanters Platinum Prince and Boss Pumacol who also calls himself Sekuru vaMako. Check the chats in between the story…Platinum-Boss Pumacol

The two chanters yesterday had an exchange of words on Facebook after Platinum Prince first called the shots saying that Pumacol is not that…Learn More.

Back to top button