Kariba water level to boost power production – ZESA

The power supply situation in the country is expected to improve in the next few months as usable water for power generation in Lake Kariba increases, an official has said.

According to the Zambezi River Authority (ZRA), the water level in the lake has been rising steadily, from 475.61 metres, or 0.83% of live storage water available for power generation, at the beginning of the year, to 477.90 metres on 13 March 2023, which translates to 16.70% usable storage.

Zimbabwe Electricity Transmission and Distribution Company (ZETDC) commercial services director Engineer Gift Ndlovu said power generation at Kariba has improved to an average of 350MW, up from 250MW early this year.

Speaking in a recent engagement with members of the Confederation of Zimbabwe Industries (CZI), Ndlovu said:

In the short to medium term, the power supply situation is bright because there has been improved dam water levels.

By May or June, it will be able to give us some comfort of around 425MW, increasing from the current production.

According to The Sunday Mail, significant inflows into Kariba usually start being recorded between April and June.

In other news – Mshka mshika driver killed in an accident

Popular Mshika shika driver Tatenda Ziramba (26) who plied the Masvingo-Zvishavane route died yesterday after his Toyota Wish burst a rear right tire and overturned.

Masvingo Police Spokesperson Inspector, Kudakwashe Dhewa, confirmed the incident and said Ziramba of Mhandamabwe died on the spot after sustaining severe head injuries. Seven other passengers on board walked away with minor injuries. Learn More

Exit mobile version